Construction of the Horizontal Infrastructure Project of the Clark International Airport New Terminal Building Project (formerly Clark Airport Low Cost Terminal) (Awarded)
Related Downloads
- Invitation to Bid (18 Jul 2018 @ 08:26:02)
- Bidding Document (18 Jul 2018 @ 08:26:02)
- Bid Bulletin No 1 (03 Aug 2018 @ 20:32:49)
- Bid Bulletin No 2 (16 Aug 2018 @ 17:50:20)
- Notice of Award (27 Nov 2018 @ 16:44:30)
- Notice to Proceed (12 Dec 2018 @ 15:27:21)
- Contract (08 Jan 2019 @ 09:55:59)
- Section VI. Technical Specifications (18 Jul 2018 @ 08:37:32)
- Section VIII. Bill of Quantities (18 Jul 2018 @ 08:37:51)
- G1. Cover (18 Jul 2018 @ 08:42:54)
- G1. Cover (18 Jul 2018 @ 08:50:06)
- G2. Cover with Signatories (18 Jul 2018 @ 08:50:52)
- G3. Index with Drawings (18 Jul 2018 @ 08:51:00)
- G4. Index of Drawings (18 Jul 2018 @ 08:51:13)
- G5. General Notes, Legends, and Abbreviations (18 Jul 2018 @ 08:51:26)
- M1. Key Map, Location Map, Vicinity Map (18 Jul 2018 @ 08:52:54)
- M2. CIAC Aerodrome (18 Jul 2018 @ 08:53:07)
- M3. Proposed Scope of Work (18 Jul 2018 @ 08:54:51)
- M4. Site Topographic Map (18 Jul 2018 @ 08:55:12)
- M5. Site Demolition Plan (18 Jul 2018 @ 08:56:02)
- M6. Site Development Plan (18 Jul 2018 @ 08:57:02)
- M7. Site Development Plan-Rapid Exit (18 Jul 2018 @ 08:59:15)
- T1.1 Taxiway Layout and Intersection (18 Jul 2018 @ 09:01:55)
- T1.2 Taxiway Layout and Intersection (18 Jul 2018 @ 09:02:11)
- T1.3 Taxiway Layout and Intersection (18 Jul 2018 @ 09:02:27)
- T1.4 Taxiway Layout and Intersection (18 Jul 2018 @ 09:02:40)
- T1.5 Taxiway Layout and Intersection (18 Jul 2018 @ 09:02:53)
- T1.6 Taxiway Layout and Intersection (18 Jul 2018 @ 09:03:05)
- T1.7 Taxiway Layout and Intersection (18 Jul 2018 @ 09:03:19)
- T1.8 Taxiway Layout and Intersection (18 Jul 2018 @ 09:03:30)
- T1.9 Taxiway Layout and Intersection (18 Jul 2018 @ 09:03:41)
- T1.10 Taxiway Layout and Intersection (18 Jul 2018 @ 09:03:54)
- T2. Taxiway Pavement Markings (18 Jul 2018 @ 09:08:13)
- T3. Taxiway Grading Plan and Profile (18 Jul 2018 @ 09:08:51)
- T4. Taxiway Cross Sections (18 Jul 2018 @ 09:09:50)
- T5. Taxiway Pavement Plan (18 Jul 2018 @ 09:10:24)
- T6.1. Existing Runway and Taxiway (18 Jul 2018 @ 09:14:20)
- T6.2. Taxiway Details (18 Jul 2018 @ 09:14:45)
- T7.1. Key Plan (18 Jul 2018 @ 09:21:44)
- T7.2. General Lighting (18 Jul 2018 @ 09:22:08)
- T7.3. Edge Lighting Layout (18 Jul 2018 @ 09:22:36)
- T7.4. Guidance Sign (18 Jul 2018 @ 09:23:02)
- T7.5. Grounding System Layout (18 Jul 2018 @ 09:24:12)
- T7.6. Lighting Circuit Layout (18 Jul 2018 @ 09:25:50)
- T7.7. Guidance Sign Circuit Layout (18 Jul 2018 @ 09:26:28)
- T7.8. Manhole and Pipes (18 Jul 2018 @ 09:27:17)
- T7.9. Details of Inset Light-Architectural (18 Jul 2018 @ 09:27:58)
- T7.10. Details of Elevated Light-Architectural (18 Jul 2018 @ 09:28:33)
- T7.11.Details of Guidance Sign-Architectural (18 Jul 2018 @ 09:29:20)
- T7.12. Details of Grounding Rod and Counterpoise-Architectural (18 Jul 2018 @ 09:30:35)
- T7.13. Details of Manhole (18 Jul 2018 @ 09:31:02)
- T7.14. Details of Ductbank-Architectural (18 Jul 2018 @ 09:31:55)
- A1. Apron General Layout (18 Jul 2018 @ 09:33:33)
- A2. Apron (E1 Ramp and E2 Ramp) Markings (18 Jul 2018 @ 09:34:14)
- A3. Apron ( E1 Ramp & E2 Ramp) Grading Plan Section & Profile (18 Jul 2018 @ 09:35:47)
- A4.1. Apron (E1 Ramp and E2 Ramp) Pavement Plan 1 (18 Jul 2018 @ 09:36:34)
- A4.2. Apron Jointing Details (18 Jul 2018 @ 09:37:38)
- A5. Apron (E1 Ramp and E2 Ramp) AGLS (18 Jul 2018 @ 09:39:24)
- A6.1 Fuel Line Layout (18 Jul 2018 @ 09:39:56)
- A6.2 Fuel Hydrant Pit Typical Details (18 Jul 2018 @ 09:40:33)
- A6.3. Cross Section Typical Details (18 Jul 2018 @ 09:41:04)
- A6.4. 4-Valve Vault Piping Arrangement (18 Jul 2018 @ 09:42:20)
- D1. Drainage (18 Jul 2018 @ 09:43:05)
- D2. Drainage (18 Jul 2018 @ 09:43:27)
- D3. Drainage (18 Jul 2018 @ 09:43:36)
- D4. Drainage (18 Jul 2018 @ 09:43:52)
- D5. Drainage (18 Jul 2018 @ 09:44:02)
- D6. Drainage (18 Jul 2018 @ 09:44:15)
- D7. Drainage (18 Jul 2018 @ 09:44:31)
- F1. Fire Hydrant Layout (18 Jul 2018 @ 09:48:04)
- R1. Key Plan (18 Jul 2018 @ 09:51:54)
- R2. General Lighting (18 Jul 2018 @ 09:52:05)
- R3. Edge Lighting layout (18 Jul 2018 @ 09:52:18)
- R4. Guidance Sign (18 Jul 2018 @ 09:52:58)
- R5. Grounding System Layout (18 Jul 2018 @ 09:53:42)
- R6. Light Circuit Layout (18 Jul 2018 @ 09:53:59)
- R7. Guidance Sign Circuit Layout (18 Jul 2018 @ 09:55:08)
- R8. Manhole and Pipes (18 Jul 2018 @ 09:56:07)
- R9. Existing and Conversion of Old Runway Layout (18 Jul 2018 @ 09:58:45)
- CIAC Existing Plan and Profiles (18 Jul 2018 @ 10:00:56)
- Minutes of the Pre-bid Conference (31 Jul 2018 @ 14:01:19)
- Page 6 of the Supplemental/Bid Bulletin No. 2 (17 Aug 2018 @ 09:13:17)
Latest BID Opportunities
-
September 11, 2024
-
September 06, 2024
-
August 23, 2024
-
August 18, 2024
-
July 13, 2024